K S N S E W E R A G E

STP

 

Sewage treatment is the process of removing contaminants from municipal wastewater, containing mainly household sewage plus some industrial wastewater. Physical, chemical, and biological processes are used to remove contaminants and produce treated wastewater that is safe enough for release into the environment.

We do maintenane service for STP

 

Work Scope

1. TO REMOVE ALL DEBRIS AND DIRT FROM THE SCREEN
BASKET. COMPLETELY WASH AND CLEAN THE BASKET
BEFORE PLACING INSIDE THE SCREEN CHAMBER.
TO PUT ALL COLLECTED DEBRIS INTO PLASTIC BAGS
TO BE TRANSPORTED AND DISPOSED AT AUTHORISED
DISPOSAL SITE.
 
2.) TO SCOOP AND REMOVE ALL DIRT AND DEBRIS ON
TOP OF THE STP SLUDGE TANK (FLOATING ) AND
DISPOSED AT AUTHORISED SITE.
 
3.) TO CHECK ALL THE STATUS AND CONDITION OF THE
SEWERAGE PUMPS AND AIR BLOWER PUMPS.
A CHECK LIST ON STATUS AND CONDITIONS OF PUMPS
WILL BE PROVIDED AT END OF THE MONTH
THIS WILL HELP TO PREVENT DAMAGE AND REPAIRS
BEFORE THEY COME WORST.
 
4.) TO APPLY LUBRICANT GREASE AND HYDRAULICS OIL
TO AIR BLOWER AND SEWERAGE PIPE JOINTS INCLUDING
BELTS.
 
5.) TO CHECK THE STATUS AND CONDITON OF THE ELECTRICAL
PANEL BOX AND OTHER WIRINGS RELATED TO THE STP.
 
5.) TO CLEAN THE STP INCOMING WASH AREA AND FLOOR.
6.) THE MAINTENANCE SERVICE MUST BE DONE CONSISTENTLY
BECAUSE THE BACTERIA NEEDED IN THE EFFICIENT
DEGRADATION OF BIOLOGICAL MATTER IS
VERY SENSITIVE TO THE ENVIRONMENT.
 
OTHER SERVICES NEEDED TO BE DONE AS AND WHEN NECCESSARY
=======================================================
1.) SEND THE EFFLUENT WATER FOR LABORATORY TESTING
INCLUDING DETAILED REPORT
 
2.) DESLUDGING OF SLUDGE USING 8 CUBIC METRE TANKER
INCLUDING SLUDGE DISPOSAL AT INDAH WATER DISPOSAL
SITE TO BE DONE 6 MONTHS ONCE.
 
3.) IF ANY PARTS OF THE STP, INCLUDING PUMPS AND
ELECTRICAL PARTS NEED TO BE REPAIRED OR REPLACED
WE WOULD PROVIDE A NEW QUOTATION FOR THE RELATED
WORKS.